B2G · wildfire prevention infrastructure · California

Catch the fire at one acre, not one hundred thousand.

A grid of tethered aerostats holds a continuous 360° watch over California's fire country. On-board AI sees the smoke column in the first ninety seconds. A firefighting drone parked at the same mast is over the flame in under ten minutes, while the fire is still one truckload of water wide.

A GLOBUS IGNI aerostat on station above a California ridgeline A streamlined tethered aerostat floats at 450 metres above ground, its upper surface covered in thin-film solar panels. A tether runs down to a mooring station on a ridge. A suppression drone launched from the node flies toward a smoke column rising from a distant ridge. 450 m AGL ground mooring · winch · drone pad
148
aerostat nodes for all of California
$174M
to build, 0.6% of the 2025 LA fire losses
<10 min
from ignition to suppressant on the flame
8:1
return in the most conservative scenario
The problem

Detection is nearly solved. Response is not.

California already watches itself well. What it cannot do is reach a new fire before the wind does. Between the alert and the first drop of water sits a gap of twenty to forty minutes, and that gap is where the entire loss column comes from.

01

The watch already exists

ALERTCalifornia runs 1,260 mountaintop cameras, 915 of them with AI smoke detection, and flagged roughly 3,600 fires in 2025, more than half of them before any 911 call. Detection is not the bottleneck any more.2

02

The response is still ground-bound

An engine or a helicopter still has to drive or fly from a station that may be 40 km away over mountain roads. In a Santa Ana or a Diablo wind event, a fire doubles in area roughly every few minutes. The asset arrives to a different fire than the one that was reported.

03

Five percent of fires cause all the damage

CAL FIRE holds about 95% of ignitions to ten acres or less.4 The handful that escape carry essentially the whole bill: roughly $9.9 billion a year on average across 2017–2021.1

Where the twenty minutes go

Elapsed time from ignition to suppressant on the flame, in a typical wildland–urban interface cell. Modelled from published dispatch and response practice.
Table view
How it works

Put the eye and the extinguisher on the same mast.

The insight is not a better camera. It is that the camera and the firefighting drone should occupy the same point in space, so that the moment detection happens, the response is already inside the cell it needs to reach.

WATCH

Continuous 360°

Each aerostat holds station at 450 m above ground with a gyro-stabilised turret: 4K visible, near-infrared, and cooled dual-band MWIR/LWIR thermal. Not a 2-minute sweep but a continuous stare, day and night, powered up the tether.

DETECT

Ninety seconds

Two channels in parallel. Edge AI classifies the smoke column against the terrain behind it, while a cooled dual-band MWIR/LWIR head looks for heat that should not be there. Heat shows at the instant of ignition and works at night; smoke carries further and sees over ridges. Because the median fire is inside the field of view of about three nodes, parallax fixes its position to under 100 m with no terrain model needed.

LAUNCH

Two minutes to airborne

A recon VTOL leaves the garage first and confirms with thermal. Suppression drones follow. Batteries are swapped robotically and charged from thin-film solar on the envelope, so the node is never waiting on a grid connection.

SUPPRESS

Under ten minutes

Three drones, 45 kg of Class A foam each, delivered onto a fire that is still measured in square metres. Release authority stays with a human at the watch floor. If it does not hold, CAL FIRE now has a confirmed fix and a live overhead feed before the first engine rolls.

The node

What one of these actually is

Not a weather balloon. A streamlined, all-weather tethered aerostat (the same class of platform that has flown persistent surveillance for decades), carrying a sensor turret, a solar array and a drone garage, held on a tether that also carries its power and its fibre.

Annotated diagram of a GLOBUS IGNI aerostat node Cutaway showing the helium envelope with thin-film solar, ballonet, sensor turret, drone garage, power-and-fibre tether, and the ground mooring station with winch, battery bank, helium reclaim and drone pad. 123 456 789 10
Node general arrangement. Not to scale; the envelope is roughly 22 m long and the tether runs 450 m to the mooring.

Key

  1. Helium envelope: 320 m³, all-weather to 60 kt
  2. Thin-film photovoltaics: 18 kWp on the upper surface
  3. Tail fins: passive weathervaning into wind
  4. Sensor turret: 4K visible + NIR + cooled dual-band MWIR/LWIR
  5. Drone garage: shelter, robotic battery swap
  6. Tether: load member + power conductors + fibre
  7. Winch & mooring: 20-minute downhaul on command
  8. Battery bank: 120 kWh, rides through the night
  9. Drone pad: 3 suppression VTOL + 1 recon VTOL
  10. Helium reclaim: closed-loop recovery on downhaul

Design point

Station altitude
450 m AGL
Detection radius
30 km
Response radius
18 km
Cell area
842 km²
Payload mass
40–120 kg
Availability
≥ 92%
CAPEX / node
$1.03M
OPEX / node·yr
$160k
Detection physics

Two bands, two different jobs

Smoke and heat are not alternatives, and the choice of infrared band matters more than the choice to use infrared at all. Heat exists at the instant of ignition, where a smoke column takes minutes to build and is close to invisible at night. Heat is also stopped by any ridge, where smoke rises over it. Carrying both costs less than picking the wrong one.

·
radiance contrast of a flame in MWIR, against 24× in LWIR
·
detectable fire at 30 km, inside a 37 m² pixel
·
extra nodes if you drop smoke detection and go thermal-only
Which infrared band actually sees fire Radiance contrast from Planck's law: a flaming front at 800 K against terrain at 300 K. The second column is the false-alarm margin, how much brighter a flame is than dark rock in full summer sun at 340 K.
Band Flame contrast vs sun-baked rock

The Planck curve rises far more steeply with temperature at 4 µm than at 10 µm, which is why satellite fire products (MODIS, VIIRS) work in the 4 µm band. The original turret specification here called for LWIR only. That was the wrong band and has been corrected to a cooled dual-band MWIR/LWIR head.

A fire does not have to fill a pixel Radiance integrates across the whole pixel, which is how satellites detect fires at 375 m ground sampling. Figures for a 1,280-pixel MWIR sensor over a 15° field of view.
Range Pixel on the ground Fire for a 1% signal

At 30 km a single pixel covers 37 m² of ground, and a fire the size of a matchbox still lifts it by one percent. Sensitivity sits three to four orders of magnitude away from being the constraint. What actually limits thermal detection is atmosphere, clutter and terrain.

Where thermal loses A smoke column rises 200 to 1,000 m and clears intervening ridges. A flame front sits on the ground, so the thermal channel only reaches its viewshed.
Station altitude Smoke column Ground-level heat

Why this does not change the fleet size

Keeping smoke as the long-range layer holds the detection radius at 30 km, comfortably above the 18 km response radius. Drone speed stays the binding constraint and the fleet stays at 148 nodes.

Going thermal-only would cut the detection radius to 16 km, which falls below the response radius. Detection would become binding for the first time and the fleet would need 189 nodes, a 28% increase to buy a system that is blind behind every ridge.

Station keeping earns its keep a second time

Because a tethered node holds position to ±20 m, every pixel maps to a fixed patch of ground permanently. That allows a thermal baseline per location, "this rock reads 65 °C at 14:00 in July", and anomaly detection against it rather than an absolute threshold. A free-flying balloon can never build that baseline, because its pixels never look at the same place twice. This is a second and entirely independent argument for the tethered architecture.

Sun glint is the hard false alarm

Sun-baked rock is handled by band choice alone. Specular glint off water, glass, metal roofing and solar panels is not: it is spectrally a 5,800 K source, and temperature by itself cannot separate it from flame. Three defences, in order of strength: glint is strongly angle-dependent so it does not appear from two viewpoints at once, and the lattice already gives 2.8× node overlap; the dual-band Dozier method solves sub-pixel area and temperature together, which separates a 900 K flame from a reflection; and the per-pixel baseline learns where glint recurs and when.

How high

Above 450 metres, altitude stops buying anything.

Three separate ceilings limit how far a node can see, and they bind in a specific order. Climbing higher defeats terrain masking, but only until the sensor itself runs out of pixels. Past that point the extra altitude costs regulatory pain and buys nothing.

Altitude and what it buys LOS horizon = 3.57·√h. Sensor ceiling is fixed at ~37 km by a 4K sensor over a 60° field of view needing three pixels on a 30 m smoke column.
Station altitude LOS horizon Terrain factor Effective r Nodes to cover SRA Airspace

Two constraints, one crossing point

Nodes needed to cover the 125,453 km² State Responsibility Area, by what limits the cell size.

The finding that sizes the whole programme

At 450 m the detection radius reaches 30 km, which would cover California with just 51 nodes. But a drone flying at 150 km/h can only reach 18 km inside a ten-minute budget.

So the fleet is sized by how fast the drone flies, not by how far the camera sees. That is what sets 148 nodes, and it means detection comes with roughly 2.8× redundant overlap for free, which is exactly what stereo geolocation needs.

Coverage

Where they go, and how many

A hexagonal lattice laid over California's fire-prone terrain. Move the response-time budget and the lattice re-sizes itself; every number below recomputes from the node count the lattice actually produces.

6 min1116 min
Time from alert to suppressant on the flame. Sets the lattice spacing.
Station altitude 450 m
Deployment phase
Layers
·
nodes
·
km² covered
·
programme CAPEX
·
OPEX per year
Aerostat siting map of California Outline of California with fire hazard belts shaded and aerostat nodes plotted on a hexagonal lattice, each with its drone response footprint.

Belts are hand-drawn generalisations of California's fire terrain, scaled so their total equals the 31-million-acre CAL FIRE State Responsibility Area (125,453 km²). They are an illustrative planning geography, not the official Fire Hazard Severity Zone shapefile. Real siting would run against FHSZ, LANDFIRE fuel models, a viewshed analysis and land access.

The open question, answered

Tethered or patrolling?

A free-flying balloon is cheaper per unit, flies far higher and sees further. It also loses the one thing the whole concept depends on: a fixed address for the drone to come home to.

Head to head Both columns sized to hold California's 125,453 km² State Responsibility Area under watch.
Dimension Tethered aerostat (stationary) Free-flying (patrolling) Winner

Verdict: tethered, with a small free-flying surge tier

Tethered wins on every axis that carries value. Power up the tether means an unlimited energy budget and a 120 kg payload instead of 25. Absolute station-keeping means the drone garage is always in the cell it serves. Fibre in the tether means zero-latency full-motion video with no satellite bill.

A free flyer can do none of this. It drifts, so it cannot host a drone base; it carries everything it burns, so its payload is a fraction; and it needs continuous airspace coordination rather than one permanent charted obstruction.

Recommendation: build the fleet tethered, and hold a tier of roughly 12 free flyers as a red-flag surge layer over Modoc, Inyo and the far northeast, terrain where node density will never pay for itself and detection-only coverage is still worth having.

Cost of continuous watch

Annualised whole-life cost per km² held under continuous watch. The free-flying bar buys detection only, with no response capability at all.
Table view

A third option, a tethered multicopter on a 100 m line, is cheaper again but cannot lift a useful payload, cannot stay up in wind and has no room for a drone garage. It suits incident-scene comms, not a permanent watch.

Loss prevention

The arithmetic of not letting it get big

California's fire loss is not spread across seven thousand fires. It is concentrated in about three. The entire economic case is one question: how often can you push a fire down one size class?

Baseline: where California's wildfire loss actually sits Modelled annual distribution, calibrated to CAL FIRE's ~$9.9B/yr average dollar damages for 2017–2021 and ~1.2–1.5M acres burned per year.
Final fire size Events / yr Suppression / event Damages / event Total / event Annual total % of loss

Three fires a year carry two thirds of the bill

Annual loss by final fire size. Note that the leftmost bar represents 6,700 fires and the rightmost represents three.
What one size class is worth Value of holding a single fire one class smaller than it would otherwise have reached. This is the unit of value the system produces.
Downshift Acres avoided Loss avoided / event

One megafire held to "merely" a large fire pays for the entire statewide build, thirteen times over.

Prevention scenarios Coverage = share of the state's ignitions starting inside a covered cell. Downshift = share of those held at least one size class smaller. Neither is a measured figure; the PoC exists to measure them.
Scenario Coverage Downshift rate Effective Loss avoided / yr Acres saved / yr Return on cost

Break-even is the effective rate at which avoided loss exactly equals the annual whole-life cost of the programme. It sits at 0.49%, which is about 36 of California's roughly 7,240 annual ignitions held one size class smaller than they would otherwise have reached. Put the other way: a single megafire demoted to a large fire funds 47 years of the programme on its own.

A deliberately pessimistic case still pays

Assume the system reaches only 15% of the state's ignitions and downshifts only 25% of those, so it works one time in twenty-seven. It still avoids $375M a year against an annual whole-life cost of $49M, a return of 8:1. The programme has to fall below an effective rate of 0.49% before it stops paying for itself at all.

The comparison that matters to a legislator

The full statewide build is 1.3% of CAL FIRE's annual budget, and its total construction cost is 0.6% of the insured losses from the January 2025 Los Angeles fires alone.3

What would falsify this

If drones cannot reliably suppress a sub-acre fire in field conditions, the downshift rate collapses and the case rests on detection alone, which ALERTCalifornia already does more cheaply. That single question is what the PoC is designed to answer first.

Cost estimate

What it costs to build and to run

A bottom-up estimate in 2026 dollars: bill of materials per node, a learning curve across the fleet, programme-level costs that do not scale, and a ten-year whole-life view including a mid-life refresh.

CAPEX per node Vendor-class estimates for hardware not yet procured. A full military tethered aerostat radar system runs around $9M; this is a far smaller, radar-free platform.5
ItemUSD
OPEX per node per year Steady-state running cost once the fleet is in service.
ItemUSD / yr
Programme cost, 148 nodes over ten years Learning curve applied: first 20 nodes at $1.15M, next 40 at $1.03M, remainder at $0.92M.
LineBasisUSD

Cumulative spend against cumulative avoided loss

Base-case scenario, phased rollout. Avoided loss is credited only in proportion to the nodes actually in service each year.
Table view
Rollout schedule
PhaseYearsNodesCAPEX
·
annualised whole-life cost per km² covered
·
of base-case avoided loss repays the full build
Carbon

Strongly carbon-negative, by a factor of thousands

The system runs on solar collected on the envelope. Its only meaningful emissions are embodied in the hardware. Against that sits every acre that does not burn.

·
Mt CO₂e avoided per year, base case
·
t CO₂e per year embodied, amortised
·
avoided per tonne emitted
·
equivalent cars taken off the road
Method. Avoided acres from the base-case scenario × 30 tCO₂e per acre, a mid-range factor for California mixed conifer and chaparral. Embodied carbon assumed at 210 tCO₂e per node (envelope, winch, steel, batteries, drones), amortised over ten years. Helium is not a greenhouse gas, but it is a finite resource: the design specifies closed-loop reclaim on every scheduled downhaul rather than venting, and hydrogen was rejected outright for a platform that operates next to fire.
Proof of concept

Three nodes, two fuel regimes, twelve months

The PoC is not a demo. It is designed to produce the two numbers the entire business case rests on: the real detection latency and the real downshift rate, under conditions that generalise to the rest of the state.

SITE A + B

Butte Unit: Sierra foothills

Two nodes 30 km apart, giving a stereo baseline. Mixed conifer and oak woodland; Camp Fire (2018) and Dixie Fire (2021) country. Tests geolocation accuracy and the long-duration watch in terrain with severe masking.

SITE C

San Diego Unit: coastal chaparral

A completely different fuel and wind regime: chaparral under Santa Ana offshore events, where fires move fastest and the response window is shortest. If the concept works here it works anywhere in the state.

PARTNER

Run inside CAL FIRE, not beside it

Detection runs in shadow mode against the ALERTCalifornia baseline for the first two phases, so every alert is scored against an existing operational system rather than against a claim. Live suppression trials happen only on CAL FIRE controlled burns.

PoC budget Twelve months, three nodes, pre-production hardware.
LineUSD
Success criteria: go / no-go Measured, not demonstrated. Missing any of the first three is a no-go regardless of the rest.
MetricTargetToday
Risks

What could stop this

Listed worst-first, including the one that could kill the programme outright. A proposal that does not name its own failure modes is not worth reading.

The next step is a $6.95M question.

Twelve months, three nodes and two fuel regimes will tell you whether a drone can reliably kill a sub-acre fire in the field. Everything else on this page follows from that one measurement. We are looking for a CAL FIRE unit willing to host it.

pz@xfaang.com · Xfaang